Zuty Becomes European Market Leader in Paint-by-Numbers Within One Week
Manual Design Work and Fragmented Multi-Market Systems Couldn't Support Rapid European Expansion
Zuty faced three obstacles while expanding across European markets: complex manufacturing processes needing automated order processing, graphic designers manually creating each template from scratch, and a rapidly expanding portfolio across multiple e-shops requiring robust product management.
Three Integrated Systems Built: Operations Platform, Computer Vision Design App, and Multi-Market E-Shop
Blindspot developed three integrated systems: a centralised internal operations platform managing thousands of products across multiple European e-shops; a computer vision-powered design application that automates template pre-preparation so designers refine rather than start from scratch; and an enhanced multi-market e-commerce platform maintaining personalised customer experience during rapid expansion.
7,000 Templates Added in One Week, European Market Leader in Three Product Categories
Within one week of launch, Zuty added more than 7,000 diamond painting templates and became the European leader across three product categories. Portfolio population became 70% faster and creative template creation 40% more efficient.
"Tailored end-to-end systems provided crucial competitive advantage for our market expansion."Lenka Šodková, CDO, Zuty
More Case Studies
Hyundai Saves $540K Annually with Optimized Production Scheduling
Smart scheduling algorithms eliminated paint shop inefficiencies and welding bottlenecks across a 1,400-vehicles-per-day production line, delivering $540,000 in annual savings with a 3-month ROI.
AI Production Planning Enables $1.9M Annual Revenue Growth at Bednar FMT
After transitioning to line-based manufacturing, Bednar FMT replaced hours of manual planning with a system that evaluates millions of scenarios in seconds — enabling one planner to do the work of three and unlocking $1.9M in additional annual demand.
Automated Inspector Scheduling Reduces TÜV SÜD Planning Team by 33%
Managing inspector dispatch across multiple China hubs via Excel was no longer viable at scale. Blindspot replaced the fragmented process with a centralised scheduling platform, cutting the scheduling team from six to four and handling peak seasons without bottlenecks.
Want to be Our Next Success Story?
Our team of AI engineers and domain experts will work with you to understand your challenge, design a solution, and deploy it to production.